Week of September 5, 2011

Starting on September 7, shallow monitoring wells MW-6 through MW-9 will be drilled and installed on the Trump Village property (Block 7273, Lots 25 and 50).  The monitoring wells will also be surveyed and water-level measurements will be collected from the wells.  These wells are being installed to confirm the hydraulic gradient, and to develop a further understanding of the groundwater flow regime and how it influences contaminant transport.

pdf Dangman RI Start Fact Sheet FINAL 08 22 11 - Final Eng-Rus